Altro Whiterock Installation 1: Site requirements

In the first part of our Altro Whiterock installation series, we run through the site requirements needed for an optimum Altro Whiterock installation.
  • Altro Whiterock Installation 1: Site requirements

  • Altro Whiterock Installation 10: Hot welded joint

  • Altro Whiterock Installation 11: Altro Whiterock Flexijoint

  • Altro Whiterock Installation 2: Workstation

  • Altro Whiterock Installation 3: Setting out

  • Altro Whiterock Installation 4: Application tape

  • Altro Whiterock Installation 7: Fitting the sheet

  • Altro Whiterock Installation 8: Thermoforming

  • Altro Whiterock Installation 9: Finishing details